All Issue

2022 Vol.32, Issue 6 Preview Page

Technical Note

31 December 2022. pp. 373-385
Abstract
References
1
Alvarez, J., Torano, M., Menendez Alvarez, and Rodrı́guez Dı́ez, R., 2003, Experimental results of a low-power roadheader driving a gallery with different types of rock at the face, Tunnelling and Underground Space Technology, 18(4), 395-404. 10.1016/S0886-7798(03)00042-7
2
Balci, C., Demircin, M.A., Copur, H., and Tuncdemir, H., 2004, Estimation of optimum specific energy based on rock properties for assessment of roadheader performance, The Journal of the South African Institute of Mining and Metallurgy, pp. 633-642.
3
Choi, S.W., Chang, S.H., Park, Y.T., Lee, G.P., and Bae, G.J., 2014, Comparative analysis of cutter acting forces and axial stresses of single and double disc cutters by linear cutting test, J. of Korean Tunn. Undergr. Sp. Assoc., 16(2), 181-191. 10.9711/KTAJ.2014.16.2.181
4
Comakli, R., Sair K., and Cemal, B., 2014, Performance prediction of roadheaders in metallic ore excavation, Tunnelling and Underground Space Technology, 40, 38-45. 10.1016/j.tust.2013.09.009
5
Copur, H., Balci, C., Tumac, D., and Bilgin, N., 2011, Field and laboratory studies on natural stones leading to empirical performance prediction of chain saw machines, Int. J. Rock Mech. Min. Sci., 48, 269-282. 10.1016/j.ijrmms.2010.11.011
6
Dewangan, S. and Chattopadhyaya, S., 2016, Performance analysis of two different conical picks used in linear cutting operation of coal, Arabian Journal for Science and Engineering, 41(1), 249-265. 10.1007/s13369-015-1786-7
7
Ebrahimabadi, A., Goshtasbi, K., Shahriar, K., and Cheraghi Seifabad, M., 2012, A Universal Model to Predict Roadheaders’ Cutting Performance, Arch. Min. Sci., 57(4), 1015-1026. 10.2478/v10267-012-0067-5
8
Ergin, H. and Acaroglu, O., 2007, The effect of machine design parameters on the stability of a roadheader, Tunnelling and Underground Space Technology, 22(1), 80-89. 10.1016/j.tust.2006.04.003
9
Fowell, R.J. and OCHEI, N.N., 1984, A comparison of dust make and energy requirements for rock cutting tools, International Journal of Mining Engineering, 2, 73-83. 10.1007/BF00880859
10
Hurt, K.G. and Evans, I., 1981, Point attack tools: An evaluation of function and use for rock cutting, Mining Engineer, 140, 673-675.
11
Jeur, S.D. and Pathak, N.K., 2008, Case study : Tunnel excavation by roadheader for railway tunnel, World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety - India, pp. 1201-1210.
12
Kim, E., Rostami, J., and Swope, C., 2012, Full Scale Linear Cuttting Experiment to Examine Conical Bit Rotation, Journal of Mining Science, 48(5), 882-895. 10.1134/S1062739148050139
13
Li, X., Huang, B., Ma, G., and Zeng, Q., 2013, Study on roadheader cutting load at different properties of coal and rock, The Scientific World Journal, Vol. 2013, Article ID 624512, 8 pages, http://dx.doi.org/10.1155/2013/624512 . 10.1155/2013/62451224302866PMC3835167
14
Pichler, J., 2011, Mechanical excavation of tunnels with Roadheaders, Lecture note, Post graduate master course - Tunnelling and Tunnel Boring Machine, Politecnico Di Torino, 1-78.
15
Rostami, J., Ozdemir, L., and Neil, D.M., 1994, Application of Heavy Duty Roadheaders for Underground Development of the Yucca Mountain Exploratory Study Facility, High level radioactive waste management, Proceedings of the 5th Annual international conference, 2, 395-402.
16
SANDVIK, 2012, Tunneling Roadheader MT720 Hard Rock, MT720 Brochure, mining.sandvik.com
17
Su, O. and Akcin, N.A., 2011, Numerical simulation of rock cutting using the discrete element method, Int. J. Rock Mech. Min. Sci., 48(3), 434-442. 10.1016/j.ijrmms.2010.08.012
18
Tatiya, R.R., 2005, Surface and Underground Excavations: Methods, Techniques and Equipment, A.A. Balkema Publishers, Taylor & Francis, London, pp. 237-240.
Information
  • Publisher :Korean Society for Rock Mechanics and Rock Engineering
  • Publisher(Ko) :한국암반공학회
  • Journal Title :Tunnel and Underground Space
  • Journal Title(Ko) :터널과 지하공간
  • Volume : 32
  • No :6
  • Pages :373-385
  • Received Date : 2022-11-21
  • Revised Date : 2022-11-28
  • Accepted Date : 2022-11-30