All Issue

2022 Vol.32, Issue 5 Preview Page

Technical Note

31 October 2022. pp. 298-311
Abstract
References
1
Alshaer, B., Darabseh, T., and Alhanouti, M., 2013, Path planning, modeling and simulation of an autonomous articulated heavy construction machine performing a loading cycle, Applied Mathematical Modelling, 37(7), 5315-5325. 10.1016/j.apm.2012.10.042
2
Gho, H.B., Park, K.A., Son, G.S., and Lee, J.K., 2005, New Construction Mechanical Engineering, GoldenBell, p. 464.
3
Han, X.Z., 2017, Development of Path Generation and Robust Tracking Controller for Unmanned Tillage Tractor in Polygonal Fields, Dept. of Biosystems and Biomaterials Science and Engineering College of Agriculture and Life Sciences Seoul National University, Ph.D. Theses.
4
Han, X.Z., Kim, H.J., Moon, H.C., Woo, H.J., Kim, J.H., and Kim, Y.J., 2013, Development of a Path Generation and Tracking Algorithm for a Korean Auto-guidance Tillage Tractor, Journal of Biosystems Engineering, 38(1), 1-8. 10.5307/JBE.2013.38.1.001
5
Joo, H.J. and Lee, K.B., 2021, Changes in Path Tracking Performance of Autonomous Vehicle According to Design Feedback Gain and Look-ahead Distance of Pure-pursuit Algorithm, Transactions of the Korean Society of Automotive Engineers, 29(9), 839-846. 10.7467/KSAE.2021.29.9.839
6
Lee, C.H., 2018, Research Trend of Autonomous Construction Machinery, Journal of Drive and Control, 15(3), 68-72.
7
Lee, J.K., Bae, J.H., Kwon, O.K., Kem, H.U., Chai, S., and Hong, D.H., 2022, Strategy for Motor Grader Blade Rotation considering Soil Distribution, Journal of the Korean Society for Precision Engineering 39(3), 201-208. 10.7736/JKSPE.021.115
8
Lee, S.H. and Adams, T.M, 1999, A path planning algorithm for automated construction equipment, International Symposium on Automation and Robotics in Construction, 13, 543-548. 10.22260/ISARC1999/0084
9
Park, Y.J., Kim, B.S., and Lee, D.E., 2015, Optimal Tractor-Blade Configuration Planning System for Eco-Economic Dozing, Journal of the Architectural Institute of Korea Structure & Construction, 32(1), 73-81. 10.5659/JAIK_SC.2016.32.1.73
10
Shevchenko, V. and Beztsennaya, Z., 2015, A method to estimate loading of a motor-grader blade control hydraulic cylinders, International Scientific Journals Machines, Technologies, Materials, 9(12), 75-77.
11
Shevchenko, V., Chaplygina, O., and Beztsennaya, Z., 2016, An analytical model of the motor-grader movement at perfoming working operations, International Scientific Journals, 1(1), 26-32.
12
Song, C.H,, Oh, J.Y., Cho, J.W., Kim, M.G., and Seok, J.H., 2021, Discrete element analysis for design modification of leveling blade on motor grader vehicle, Journal of Korean Tunnelling and Underground Space Association, 23(6), 324-438.
13
Yoon, Y.J., Kim, J., Kang, D.J., 2011, The Study of the Autonomous Driving Method for Tracking Way Point at the Unmanned Vehicle, Institute of Control, Robotics and Systems, pp. 1-5.
Information
  • Publisher :Korean Society for Rock Mechanics and Rock Engineering
  • Publisher(Ko) :한국암반공학회
  • Journal Title :Tunnel and Underground Space
  • Journal Title(Ko) :터널과 지하공간
  • Volume : 32
  • No :5
  • Pages :298-311
  • Received Date : 2022-10-14
  • Revised Date : 2022-10-20
  • Accepted Date : 2022-10-20