Technical Note
BBC, 2024, HS2 tunnelling machine completes journey in Buckinghamshire, BBC News, Buckinghamshire & PA Media, 22 March 2024.
Bertsche, B., 2008, Reliability Engineering in the Mechanical and Automotive Industry, translated and edited by Reliability Evaluation Center, Korea Institute of Machinery and Materials.
Bloch, H.P., and Geitner, F.K., 1997, Practical Machinery Management for Process Plants: Volume 2: Machinery Failure Analysis and Troubleshooting, Gulf Publishing Company.
Borgovini, R., Pemberton, S., and Rossi, M., 1993, Failure Mode, Effects, and Criticality Analysis (FMECA) Guide, NASA Technical Report, Reliability Analysis Center, Griffiss AFB, NY, Report No. ADA278508.
10.21236/ADA278508Chen, W., Yang, B., and Liu, Y., 2022, An integrated QFD and FMEA approach to identify risky components of products, Advanced Engineering Informatics, 54, 101808.
10.1016/j.aei.2022.101808Choi, Y.T., Lee, D.G., Kim, M.G., Oh, J.Y., and Cho, J.W., 2022, Continuous Excavation Type TBM Parts Modification and Control Technology for Improving TBM Performance, Tunnel and Underground Space, 32(6), 345-352.
Hendricks, C., Williard, N., Mathew, S., and Pecht, M., 2015, A failure modes, mechanisms, and effects analysis (FMMEA) of lithium-ion batteries, Journal of Power Sources, 297, 113-120.
10.1016/j.jpowsour.2015.07.100Kang, B.S., Ji, S.W., and Jang, J.S., 2006, A reliability test standards and failure analysis for pneumatic cylinder, In Proceedings of the Korea Society for Power System Engineering Conference, 184-187.
Kim, H.E., 2006, Korean Novel Concept for the Reliability Certification system, Journal of Reliability Applications Research, 6(1), 63-91.
Kim, M.G., Cho, J.W., and Cha, H.S., 2023a. Investigation of prior technology and development case for consecutive excavation technique of shield TBM. Tunnel and Underground Space, 33(5), 299-311.
Kim, M.G., Cho, M.G., Cho, J.W., and Jeong, H.Y., 2023b, Compression Test of a TBM Thrust Jack for Validating Buckling Stability, Tunnel and Underground Space, 33(5), 339-347.
Lee, H.S., Oh J.Y., and Cho J.W., 2025, Design Modification and Virtual Assembly Simulation of a TBM Erector for Helical Segments, Tunnel and Underground Space, 35(2), 135-48.
10.7474/TUS.2025.35.2.135Moss, T.R., and Woodhouse, J., 1999, Criticality analysis revisited. Quality and reliability engineering international, 15(2), 117-121.
10.1002/(SICI)1099-1638(199903/04)15:2<117::AID-QRE238>3.3.CO;2-9Park, J.W., Choi, B.O., and Kim, K.K., 2013, Study on accelerated life testing of swing reduction gear box for hybrid excavator, Transactions of the Korean Society of Mechanical Engineers A, 37(11), 1407-1413.
10.3795/KSME-A.2013.37.11.1407Tröndle, J., Wehrmeyer, G., and Steiner, F., 2023, Continuous advance – developments for a new Herrenknecht TBM, Expanding Underground. Knowledge and Passion to Make a Positive Impact on the World – Anagnostou, Benardos & Marinos (Eds), 2560-2564.
10.1201/9781003348030-308U.S. Army Corps of Engineers, 2025, Engineering and construction bulletin (ECB No. 2025-5, Rev. 1): Mechanical and electrical reliability modeling for major rehabilitation evaluation reports. Washington, DC: U.S. Army Corps of Engineers.
- Publisher :Korean Society for Rock Mechanics and Rock Engineering
- Publisher(Ko) :한국암반공학회
- Journal Title :Tunnel and Underground Space
- Journal Title(Ko) :터널과 지하공간
- Volume : 35
- No :5
- Pages :498-512
- Received Date : 2025-10-10
- Revised Date : 2025-10-17
- Accepted Date : 2025-10-22
- DOI :https://doi.org/10.7474/TUS.2025.35.5.498



Tunnel and Underground Space







