All Issue

2023 Vol.33, Issue 6 Preview Page

Technical Note

31 December 2023. pp. 445-471
Abstract
References
1
Andersson, J., Strom, A., Svemar, C., Almen, K.E., and Ericsson, L.O., 2000, What requirements does the KBS-3 repository make on the host rock, Geoscientific Suitability Indicators and Criteria for Siting And Site Evaluation.
2
Bae, S.H., Jeon, S.W., Choi, Y.K., and Kim, H.S., 2002, Study on Characteristics of In-situ Rock Stress State in Mountainous Region by Hydraulic Fracturing Method, J. of Korean Tunn. Undergr. Sp. Assoc., 4(1), 57-70.
3
Carlsson, A., and Christiansson, R., 1986, Rock stresses and geological structures in the Forsmark area, In ISRM International Symposium, OnePetro.
4
Castro, L.A.M., McCreath, D.R., and Oliver, P., 1996, Rockmass damage initiation around the Sudbury neutrino observatory cavern, In 2nd North American Rock Mechanics Symposium, OnePetro.
5
Diederichs, M.S. and Kaiser, P.K., 1999, Tensile strength and abutment relaxation as failure control mechanisms in underground excavations, International Journal of Rock Mechanics and Mining Sciences, 36(1), 69-96. 10.1016/S0148-9062(98)00179-X
6
Diederichs, M.S., 2003, Rock fracture and collapse under low confinement conditions. Rock Mech. Rock Eng., 35, 339-381. 10.1007/s00603-003-0015-y
7
Hajiabdolmajid, V., Martin, C.D., and Kaiser, P.K., 2000, Modelling Brittle Failure of Rock, Paper presented at the 4th North American Rock Mechanics Symposium, NARMS 2000, A.A. Balkema, Seattle, Washington, 991-998.
8
Hedley, D.G.F. and Grant, F., 1972, Stope-and-pillar design for the Elliot Lake Uranium Mines, Bull. Can. Inst. Min. Metall., 65, 37-44.
9
Hedley, D.G.F., Roxburgh, J.W., Muppalaneni, S.N., 1984, A case history of rockbursts at Elliot Lake. In: Proceedings of 2nd International Conference on Stability in Underground Mining, Lexington. New York: American Institute of Mining, Metallurgical and Petroleum Engineers, Inc., 210-34.
10
Hoek, E. and Brown, E.T., 1980, Underground excavations in rock, Inst. Mining and Metallurgy, London, 156.
11
Hudson, J.A., Brown, E.T., and Fairhurst, C., 1972, Shape of the complete stress-strain curve for rock, In Proc. 13th U.S. Symp. on Rock Mechanics, Urbana, (Ed. E. Cording), American Society of Civil Engineers, New York, 773-795.
12
KAERI, 2008, Current R&D Status on High-Level Rdioactive Waste Disposal in Selected Countries, AR-821.
13
Lee, C.S., Cho, W.J., Lee, J.W., and Kim, G.Y., 2019, Numerical Analysis of Coupled Thermo-Hydro-Mechanical (THM) Behavior at Korean Reference Disposal System (KRS) Using TOUGH2-MP/FLAC3D Simulator, J. Nuclear Fuel Cycle & Waste Technology, 17(2), 183-202. 10.7733/jnfcwt.2019.17.2.183
14
Lunder, P.J. and Pakalnis, R.C., 1997, Determination of the strength of hard-rock mine pillars, CIM bulletin, 90(1013), 51-55.
15
Martin, C.D. and Chandler, N.A., 1994, December, The progressive fracture of Lac du Bonnet granite, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 31(6), 643-659, Pergamon. 10.1016/0148-9062(94)90005-1
16
Martin, C.D. and Maybee, W.G., 2000, The strength of hard-rock pillars.International Journal of Rock Mechanics and Mining Sciences, 37(8), 1239-1246. 10.1016/S1365-1609(00)00032-0
17
Martin, C.D., Christiansson, R., and Söderhäll, J., (2001), Rock stability considerations for siting and constructing a KBS-3 Based on experiences from Äspö HRL, AECL's URL, tunnelling and miningrepository, Technical Report TR-01-38, SKB
18
Martin, C.D., Kaiser, P.K., and McCreath, D.R., 1999b, Hoek-Brown parameters for predicting the depth of brittle failure around tunnels, Canadian Geotechnical Journal, 36(1), 136-151. 10.1139/t98-072
19
Martin, C.D., Kaiser, P.K., Tannant, D.D., and Yazici, S., 1999a, Stress path and instability around mine openings, In 9th ISRM Congress, 1, 311-315.
20
Ohta, M.M. and Chandler, N.A., 1997, AECL's underground research laboratory: technical achievements and lessons learned. Canada: N. p., Web.
21
Olsson, O., 1996, ZEDEX-A Study of the Zone of Excavation Disturbance for Blasted and Bored Tunnels, SKB International Cooperation Report., 96-3.
22
Pettitt, W. and Young, P., 2000, Analysis of the in situ principal stress field at the HRL using acoustic emission data, Prototype Experiment, Report IPR-01, 9.
23
Posiva Oy., 2013, WR 2012-66 Facility Description 2012. Summary Report of Encapsulation Plan and Disposal Facility Designs.
24
Pritchard, C.J. and Hedley, D.G.F., 1993, Progressive pillar failure and rockbursting at Denison Mine, In Proc. 3rd Int. Symp. on Rockbursts and Seismicity in Mines, Rotterdam, A. A. Balkema, Kingston (Ed. R. P. Young), 111-116.
25
Read, R.S. and Chandler, N.A., 1997, Minimizing excavation damage through tunnel design in adverse stress conditions, In Proceedings of the International Tunnelling Association World Tunnel Congress, Vienna, 1, 23-28.
26
Siren, T., Kantia, P., and Rinne, M., 2015, Considerations and observations of stress-induced and construction-induced excavation damage zone in crystalline rock. International Journal of Rock Mechanics and Mining Sciences, 73, 165-174. 10.1016/j.ijrmms.2014.11.001
27
SKB, 2010, Design, construction and initial state of the underground openings, TR-10-18.
28
Soder, P. and Krauland, N., 1990, Determination of pillar strength by full scale pillar tests in the Laisvall mine, In Plenary scientific session of the International Bureau of Strata Mechanics, world mining congress, 39-59.
29
Swan, G., 1985, Strength distribution and potential for multiplepillar collapse. Divisional Report MRL 85-127 (TR), CANMET.Energy Mines and Resources, Canada.
30
Synn, J.H., Park, C., and Lee, B.J., 2013, Regional Distribution Pattern and Geo-historical Transition of In-situ Stress Fields in the Korean Peninsula, Tunn. Undergr. Space, 23(6), 457-469. 10.7474/TUS.2013.23.6.457
Information
  • Publisher :Korean Society for Rock Mechanics and Rock Engineering
  • Publisher(Ko) :한국암반공학회
  • Journal Title :Tunnel and Underground Space
  • Journal Title(Ko) :터널과 지하공간
  • Volume : 33
  • No :6
  • Pages :445-471
  • Received Date : 2023-11-23
  • Revised Date : 2023-12-26
  • Accepted Date : 2023-12-26