Technical Note
Åkesson, M., 2017, Full-scale test of the Dome Plug for KBS-3V deposition tunnels, Gas tightness test. SKB P-17-37, Svensk Kärnbränslehantering AB.
Åkesson, M., sandén, T., Goudarzi, R., and Malmberg, D., 2019, Full-scale test of the Dome Plug for KBS-3V deposition tunnels, Monitoring, function tests and analysis of bentonite components. SKB P-18-15, Svensk Kärnbränslehantering AB.
Enzell, J. and Malm, R., 2019, Full-scale test of the Dome Plug for KBS-3V deposition tunnels, Project summary and evaluation of the final results, SKB TR-18-02, Svensk Kärnbränslehantering AB.
Grahm, P., Malm, R., and Eriksson, D., 2015, System design and full-scale testing of the Dome Plug for KBS-3V deposition tunnels, Main report, SKB TR-14-23, Svensk Kärnbränslehantering AB.
Kristensen, A.L., 2018, Revised replacement report, Examination of Vault Plug, Report 117-30437, Force Technology, SKBdoc 1618653 ver 1.0, Svensk Kärnbränslehantering AB.
Malm, R., 2012, Low-pH concrete plug for sealing the KBS-3V deposition tunnels, SKB R-11-04, Svensk Kärnbränslehantering AB.
Malm, R., Enzell, J., and Hassanzadeh, M., 2019, Full-scale test of the Dome Plug for KBS-3V deposition tunnels, structural response ot the concrete dome, NDT, FE-simulation and evaluation of measurements during the leakage and strength test, SKB P-18-14, Svensk Kärnbränslehantering AB.
Park, B.K., Lee, H.K., Jeon, S.W., and Park, E.S., 2000, Numerical Analysis of the Mechanical and Hydraulic behavior of Concrete Plug in Underground Storage Cavern, Tunnel and Underground Space, 10, 344-354
Park, D.H., Kim, H.M., Ryu, D.W., Synn, J.H., and Song, W.K., 2011, Numerical Study on the Optimal Shape of Concrete Plug for Compressed Air Energy Storage Caverns, Tunnel and Underground Space, 21(3), 164-173.
SKB and Posiva., 2017, Safety functions, performance targets and technical design requirements for a KBS-3V repository, Conclusion and recommendations from a joint SKB and Posiva working group, Posiva SKB Report 01, Posiva Oy, Svensk Kärnbränslehantering AB.
SKB., 2010a, Design and production of the KBS-3 repository, SKB TR-10-12, Svensk Kärnbränslehantering AB.
SKB., 2010b, Design, production and initial state of the backfill and plug in deposition tunnels, SKB TR-10-16, Svensk Kärnbränslehantering AB.
- Publisher :Korean Society for Rock Mechanics and Rock Engineering
- Publisher(Ko) :한국암반공학회
- Journal Title :Tunnel and Underground Space
- Journal Title(Ko) :터널과 지하공간
- Volume : 35
- No :3
- Pages :179-193
- Received Date : 2025-04-18
- Revised Date : 2025-04-29
- Accepted Date : 2025-05-12
- DOI :https://doi.org/10.7474/TUS.2025.35.3.179



Tunnel and Underground Space







