All Issue

2024 Vol.34, Issue 2 Preview Page

Technical Note

30 April 2024. pp. 104-126
Abstract
References
1

Autio, J., Hassan, M., Karttunen, P., and Keto, P., 2012, Backfill Design 2012, Posiva 2012-15, Posiva Oy.

2

Hansen, J., Korkiala-Tanttu, L., Keski-Kuha, E., and Keto, P., 2010, Deposition tunnel backfill design for a KBS-3V repository, Working Report 2009-129, Posiva Oy.

3

Hartley, L., Hoek, J., Swan, D., and Roberts, D., 2010, Hydrological discrete fracture network modelling of groundwater flow under open repository conditions, Posiva Working Report 2010-51, Posiva Oy.

4

Hong, C.H, Kim, J.W., Kim, J.S., and Lee, C., 2022, Review of Erosion and Piping in Compacted Bentonite Buffers Considering Buffer-Rock Interactions and Deduction of Influencing Factors, Tunnel & Underground Space, 32(1), 30-58

5

JNC., 1999, H12 Project to Establish Technical Basis for HLW Disposal in Japan(Supporting Report 2), JNC TN1400 99-020, Japan Nuclear Cycle Development Institute.

6

Johannesson, L.E., 2004, Prototype Repository, Installation of buffer and canisters in section II, IPR-04-13, SKB.

7

Joyce, S., Swan, D., and Hartley, L., 2013, Calculation of open repository inflows for Forsmark, SKB R-13-21, Svensk Kärnbränslehantering AB.

8

Juvankoski, M, Ikonen, K, and Jalonen, T., 2012, Buffer Production Line 2012, Design, Production and Initial State of the Buffer, Posiva 2012-17, Posiva Oy.

9

Juvankoski, M., 2012, Buffer Design 2012, Posiva 2012-14, Posiva Oy.

10

Keski-Kuha, E., Nemlander, R., and Koho, P., 2012, BACEKO II, Flow-through, openfront and saturation tests of pre-compacted backfill blocks in a quarter-scale test tunnel. Posiva Oy, Olkiluoto, Finland. Working Report 2012-41.

11

Keto, P., Dixon, D., Jonsson, E., and Gunnarsson, D., 2009, Assessment of backfill design for KBS-3V repository, SKB R-09-52, Svensk Kärnbränslehantering AB.

12

Keto, P., Hassan, M., Karttunen, P., Kiviranta, L., Kumpulainen, S., Korkiala-Tanttu, L., Koskinen, V., Jalonen, T., Koho, P., and Sievänen, U., 2013, Backfill production line 2012, Design, production and initial state of the deposition tunnel backfill and plug, Posiva 2012-18, Posiva Oy.

13

Koskinen, V. and Sandén, T., 2014, System design of backfill. Distribution of inflowing water by using geotextiles. SKB R-14-10, SKB.

14

Ku, H., Kim, S., and Lee, J.H., 2023, Analysis on Design Change for Backfilling Solution of the Disposal Tunnel in the Deep Geological Repository for High-Level Radioactive Waste in Finland, Tunnel & Underground Space, 33(6), 435-444.

15

Park, J.H., Lee, J.W., and Kwon, S.K., 2011, An Analysis of the Water Saturation Processes in the Engineered Barrier of a High Level Radioactive Waste Disposal System, J. of the Korean Radioactive Waste Society, 9(1), 23-32.

10.7733/jkrws.2011.9.1.23
16

Posiva and SKB., 2017, Safety functions, performance targets and technical design requirements for a KBS-3V repository, Posiva SKB Report 01.

17

Posiva., 2012, Safety case for the disposal of spent nuclear fuel at Olkiluoto - Design basis 2012, Posiva 2012-03, Posiva Oy.

18

Raiko, H., 2013, Canister design 2012, Posiva 2012-13, Posiva Oy.

19

Riikonen, E., 2009, Flow-through and wetting tests of pre-compacted backfill blocks in a quarter-scale test tunnel. Posiva Oy, Finland, Eurajoki. Working Report 2008-89.

20

Ritola, J. and Peura, J., 2012, Buffer Moisture Protection System, Working Report 2012-05. Posiva Oy.

21

Saanio, T., Ikonen, A., and Keto, P., 2013, Design of the Disposal Facility 2012, Posiva Oy, Finland, Working Report 2013-17.

22

Sandén, T. and Börgesson, L., 2008, Deep repository-engineered barrier system. Piping and erosion in tunnel backfill, SKB R-06-72, SKB.

23

Sandén, T. and Börgesson, L., 2014, System design of backfill, SKB R-14-09, SKB.

24

Sandén, T. and Jensen, V., 2016, Pellet optimization - influence of fines. KBP1011 water handling during backfill installation, SKB R-16-15, SKB.

25

Sandén, T., Marjavaara, P., and Fritzell, A., 2017, Water handling during backfilling, Posiva SKB Report 05.

26

Simmons, G.R. and Baumgartner, P., 1994, The Disposal of Canada's Nuclear Fuel Waste: Engineering for a Disposal Facility, AECL-10715, Atomic Energy of Canada Limited.

27

SKB., 2009, Design premises for a KBS-3V repository based on results from the safety assessment SR-Can and some subsequent analyses, SKB TR-09-22, SKB.

28

SKB., 2010, Design, production and initial state of the backfill and plug in deposition tunnels, SKB TR-10-16, SKB.

29

SKB., 2013, RD&D Programme 2013, Programme for research, development and demonstration of methods for the management and disposal of nuclear waste, SKB TR-13-18, Svensk Kärnbränslehantering AB.

30

SKB., 2015, Aspö Hard Rock Laboratory annual report 2014, TR-15-10, Swedish Nuclear Fuel and Waste Management Company.

31

Wimelius, H. and Pusch, R., 2008, Backfilling of KBS-3V Deposition Tunnels - Possibilities and Limitations. Svensk Kärnbränslehantering AB, Stockholm, Sweden. SKB R-08-59.

Information
  • Publisher :Korean Society for Rock Mechanics and Rock Engineering
  • Publisher(Ko) :한국암반공학회
  • Journal Title :Tunnel and Underground Space
  • Journal Title(Ko) :터널과 지하공간
  • Volume : 34
  • No :2
  • Pages :104-126
  • Received Date : 2024-04-17
  • Revised Date : 2024-04-22
  • Accepted Date : 2024-04-23