All Issue

2022 Vol.32, Issue 6

Technical Note

31 December 2022. pp. 345-352
Abstract
References
1
Choi, S.W., Lee, C.H., Kang, T.H., and Chang, S.H., 2020, Current Status of Technical Development for TBM Simulator, Tunnel and Underground Space, 30(5), 433-445.
2
Jang, S.H., Kim, S.H., Lee, S.W., and Bae, G.J., 2010, Construction of Long Undersea Tunnel by Shield TBM, Magazine of Korean Tunnelling and Underground Space Association, 12(3), 9-22.
3
Kim, Y.G., Moon, J.S., Shim, J.B., Lee, S.B., Choi, C.R., and Chun, Y.C., 2011, Comparative risk analysis of NATM and TBM for mixed-face large-diameter urban tunneling, Journal of Korean Tunnelling and Underground Space Association, 13(1), 19-32.
4
Lee, H.S., Na, Y.M., Jang, H.S., Suk, I.H., Kang, S.H., Kim, H.T., and Park, J.K., 2019, A Study on the Stability of Shield TBM Thrust Jack in the Behavior of Operating Fluid According to Thrust Force, Journal of the Korean Society of Manufacturing Process Engineers, 18(1), 38-45. 10.14775/ksmpe.2019.18.1.038
5
Lee, S.W., Jang, S.H., and Choe, S.U., 2011, Forecasting Future Demand for TBM Tunnels in Korea, Geotechnical Engineering, 27(2), 18-26.
6
Park, J.S., 2021, Focusing on the comparison between Gripper TBM and Slurry Shield TBM, Magazine of Korean Tunnelling and Underground Space Association, 23(1), 44-60.
7
Science & Technology Strategy Institute, 2021, Consecutive Excavation Technological Development Project of Tunnel Boring Machine,Ministry of Land, Infrastructure and Transport, 136-155.
Information
  • Publisher :Korean Society for Rock Mechanics and Rock Engineering
  • Publisher(Ko) :한국암반공학회
  • Journal Title :Tunnel and Underground Space
  • Journal Title(Ko) :터널과 지하공간
  • Volume : 32
  • No :6
  • Pages :345-352
  • Received Date : 2022-10-24
  • Revised Date : 2022-11-01
  • Accepted Date : 2022-11-03