All Issue

2026 Vol.36, Issue 4 Preview Page

Original Article

31 August 2026. pp. 352-361
Abstract
References
1

Chang, S.B., and Moon, H.K., 1998, A Study on the Quantitative Evaluation of the Load Distribution Factors Considering the Design Conditions of Tunnel Especially for the Ring-cut Excavation Method, Journal of the Korean Geotechnical Society, 14(5), 5-16.

2

Jeong, D.Y., 1993, A Study on the Load Distribution Factor in Two-dimensional Analysis Model for the Simulation of Three-dimensional Effect of Tunnel Face, Ph.D. Thesis, Seoul National University, p.109.

3

Korea National Railway, 2012, KR C-10030 Allowable Stress Design.

4

Korea National Railway, 2022, KR SD C-12010 Tunnel Plan.

5

Korea National Railway, 2024, KR C-12030 Tunnel Support System.

6

Korean Tunnelling and Underground Space Associations, 2010, Case histories of tunnel collapse.

7

Seoul Metropolitan Infrastructure Headquarters, 2015, Improvement Plan of Seoul Subway Monitoring Management.

Information
  • Publisher :Korean Society for Rock Mechanics and Rock Engineering
  • Publisher(Ko) :한국암반공학회
  • Journal Title :Tunnel and Underground Space
  • Journal Title(Ko) :터널과 지하공간
  • Volume : 36
  • No :4
  • Pages :352-361
  • Received Date : 2026-06-29
  • Revised Date : 2026-08-04
  • Accepted Date : 2026-08-11