Case Study
Celland, R.S. and Singh, K.H., 1973, Development of post pillar mining at Falconbridge Nickel Mines Ltd., CIM Bulletin.
Ibishi, G., Genis, M., and Yavuz, M., 2022, Post-pillars design for safe exploitation at Trepça hard rock mine (Kosovo) based on numerical modeling, Geomechanics and Engineering, 28(5), 463-475.
Kim, Y.B., Chung, S.K., Jo, S.H., Kim, C.O., and Um, W.Y., 2015, Hybrid room-and-pillar mining method, Patent No.1015 657890000.
Kwon, M.H., Choi, S.O., and Kim, C.O., 2016, A study on stability analysis of large underground limestone openings considering excavation damaged zone, Tunnel and underground space, 26(2), 131-142.
10.7474/TUS.2016.26.2.131Lee, S.J., Kim, B.R., Jin, Y.H., and Choi, S.O., 2017, A study on the stability analysis of underground mine using lidar, Tunnel and Underground Space, 27(6), 406-421.
Liu, J., Sui, W., and Zhao, Q., 2017, Environmentally sustainable mining: a case study of intermittent cut-and-fill mining under sand aquifers, Environmental Earth Sciences, 76, 1-20.
10.1007/s12665-017-6892-2Raffaldi, M.J., Seymour, J.B., Richardson, J., Zahl, E., and Board, M., 2019, Cemented paste backfill geomechanics at a narrow- vein underhand cut-and-fill mine, Rock Mechanics and Rock Engineering, 52(12), 4925-4940.
10.1007/s00603-019-01850-431768089PMC6876314Singh, U.K., Jain, P.N., and Prasad, M., 1995, Post-pillar behaviour at deep levels in a copper mine, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 32(6), 585-593.
10.1016/0148-9062(95)00004-Z- Publisher :Korean Society for Rock Mechanics and Rock Engineering
- Publisher(Ko) :한국암반공학회
- Journal Title :Tunnel and Underground Space
- Journal Title(Ko) :터널과 지하공간
- Volume : 34
- No :6
- Pages :675-687
- Received Date : 2024-12-10
- Revised Date : 2024-12-17
- Accepted Date : 2024-12-17
- DOI :https://doi.org/10.7474/TUS.2024.34.6.675