All Issue

2024 Vol.34, Issue 5 Preview Page

Original Article

31 October 2024. pp. 543-553
Abstract
References
1

Attewell, P.B., Yeates, J., and Selby, A.R., 1986, Soil movements induced by tunnelling and their effects on pipelines and structures, Blackie, 1st edition, p.317.

2

Burland, J.B., 2001, Assessment methods used in design, In J.B. Burland, J.R. Standing & F.M. Jardine (Eds.), Building response to tunnelling - Case studies from construction of the Jubilee line extension, London, 1, 23-44, Thomas Telford Ltd.

3

Cao, S., Cui, J., Fang, Y., and Deng, R., 2019, Performance of slurry TBM tunnelling in sandy cobble ground - A case study in Lanzhou, Tunnel Engineering, 23, 3207-3217.

10.1007/s12205-019-1627-4
4

Chen, R.-P, Lin, X.-T., Kang, X., Zhong, Z.-Q., Liu, Y., Zhang, P., and Wu, H.-N., 2018, Deformation and stress characteristics of existing twin tunnels induced by close-distance EPBS under-crossing, Tunnelling and Underground Space Technology, 82, 468-481.

10.1016/j.tust.2018.08.059
5

Choi, J., Park, D., and Chung, J., 2019, Evaluation of track irregularity effect due to adjacent excavation on serviced railway line, The Journal of the Convergence on Culture Technology, 5(4), 401-406.

6

Cooper, M.L., 2001, Tunnel-induced ground movements and their effects on existing tunnels and tunnel linings, PhD thesis, The University of Birmingham.

7

Cording, E.J., and Hansmire, W.H., 1975, Displacement around soft ground tunnels, Proceedings of the 5th Pan-American Conference of Soil Mechannics and Foundation Engineering, 571-663.

8

Gettu, R., Barragan, B., Garcia, T., Ortiz, J., and Justa, R., 2006, Fiber concrete tunnel lining: construction of a subway line in Barcelona, Concrete International, 28(8), 63-69.

9

Jin, D., Yuan, D., Li, X., and Zheng, H., 2018, An in-tunnel grouting protection method for excavating twin tunnels beneath an existing tunnel, Tunnelling and Underground Space Technology, 71, 27-35.

10.1016/j.tust.2017.08.002
10

Korea National Railway, 2022, Track Maintenance Guidelines, Article 9: Track Irregularity Management Standards.

11

Kurhan, D., Kurhan, M., Horvath, B., and Fischer, S., 2023, Determining the deformation characteristics of railway ballast by mathematical modeling of elastic wave propagation, Applied Mechanics, 4(2), 803-815.

10.3390/applmech4020041
12

Lee, S.W., Chang, S.H., Park, K.H., and Kim, C.Y., 2011, TBM performance and development state in Korea, Procedia Engineering, 14, 3170-3175.

10.1016/j.proeng.2011.07.400
13

Li, X., Yuan, D., Guo, Y., and Cai, Z., 2016, Use of a 10.22 m diameter EPB shield: a case study in Beijing subway construction, SpringerPlus, 5, 1-15.

10.1186/s40064-016-3672-527933260PMC5121113
14

O'Reilly, M.P., and New, B.M., 1982, Settlements above tunnels in the United Kingdom - their magnitude and predition, Tunnelling 82', Ed. Jones, M.J., 173-181.

15

Peck, R.B., 1969, Deep excavation and tunneling in soft ground, Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering, State-of-Art Report, 225-290.

16

Seo, K.C., Kim, J.W., and Park, N.S., 2001, Subway tunnel under the Han river, Seoul, Structural Engineering International, 11(1), 25-28.

10.2749/101686601780324331
17

Standing, J., and Burland, J., 2006, Unexpected tunnelling volume losses in the Westminster area, London, Geotechnique, 56(1), 11-26.

10.1680/geot.2006.56.1.11
18

Su, T., Zhang, Y., and Goh, K.H., 2017, Field performance of twin bored tunnelling in different geological conditions - Construction of MRT downtown line 3 in Singapore, Proceedings of the 19th International Conference on Soil Mechanics and Geotechnical Engineering, 1777-1780.

19

Tucker, W., 2017, Crossrail project: the execution strategy for delivering London's Elizabeth line, Proceedings of the Civil Engineers, 170(CE5), 1600021.

10.1680/jcien.16.00021
Information
  • Publisher :Korean Society for Rock Mechanics and Rock Engineering
  • Publisher(Ko) :한국암반공학회
  • Journal Title :Tunnel and Underground Space
  • Journal Title(Ko) :터널과 지하공간
  • Volume : 34
  • No :5
  • Pages :543-553
  • Received Date : 2024-10-08
  • Revised Date : 2024-10-16
  • Accepted Date : 2024-10-18