All Issue

2023 Vol.33, Issue 4 Preview Page

Case Study

31 August 2023. pp. 255-264
Abstract
References
1
Cao, L., Fang, Q., Zhang, D., and Chen, T., 2018, Subway station construction using combined shield and shallow tunnelling method : Case study of Gaojiayuan station in Beijing, Tunn. Undergr. Space Technol., 82, 627-635. 10.1016/j.tust.2018.09.010
2
Korea National Railway(KR), 2020, Track Maintenance Guidelines.
3
Liu, J., Wang, F., He, S., Wang, E., and Zhou, H., 2015, Enlarging a large-diameter shield tunnel using the pile-beam-arch method to create a metro station, Tunn. Undergr. Space Technol., 49, 130-143. 10.1016/j.tust.2015.04.006
4
Xu, X., Li, Z., Fang, Q., and Zheng, H., et al., 2020, Challenges and countermeasures for using pile-beam-arch approach to enlarge large-diameter shield tunnel to subway station, Tunn. Undergr. Space Technol., 98. 10.1016/j.tust.2020.103326
Information
  • Publisher :Korean Society for Rock Mechanics and Rock Engineering
  • Publisher(Ko) :한국암반공학회
  • Journal Title :Tunnel and Underground Space
  • Journal Title(Ko) :터널과 지하공간
  • Volume : 33
  • No :4
  • Pages :255-264
  • Received Date : 2023-08-08
  • Revised Date : 2023-08-21
  • Accepted Date : 2023-08-22