Technical Note
Abstract
References
Information
Brian F., Michael B., Knut G., 2008, Pre-excavation driling and grouting for water control and ground improvement in highly variable ground conditions at the Arrowhead Tunnels Project, Proceedings of North American Tunneling 2008, Society for Mining, Metallurgy & Exploration, San Francisco, 749-765.
Jeong, S.H., Park, B.S., Lee, K.H., Jo, H., 2010, Construction case of Noksan sewage treatment plant discharge channel - Construction case of shield tunnel for passing through soft ground and hydrothermal alteration zone -, Journal of Korean Tunnelling and Underground Space Association, Vol. 12, No. 2, 31-46.
Kim, C.S., Kim, J.Y., Lee, S.H., Cho, H., Hwang, D.A., 2016, Case study on the application of shield TBM in the gravel layer with high water pressure underpassing the Han River, Proceedings of The 15th Asian Regional conference on Soil mechanics and Geotechnical engineering, Vol. 2, No. 43, Fukuoka, 1536-1539.
10.3208/jgssp.KOR-22- Publisher :Korean Society for Rock Mechanics and Rock Engineering
- Publisher(Ko) :한국암반공학회
- Journal Title :Tunnel and Underground Space
- Journal Title(Ko) :터널과 지하공간
- Volume : 28
- No :6
- Pages :528-546
- Received Date : 2018-11-16
- Revised Date : 2018-12-06
- Accepted Date : 2018-12-18
- DOI :https://doi.org/10.7474/TUS.2018.28.6.528